Join our Q&R Session about Banke full-electric powertrains on the 29th of June

Join our Q&R Session about Banke full-electric powertrains on the 29th of June

Main points to be discussed:
•          What is a full-electric powertrain?
•          Can it help with your challenges?
•          What type of vehicles be converted?
•          Component architecture of Banke full-electric powertrain
•          Financial implications
•          Perspectives and development of full-electric powertrains
The session will be interactive to allow everyone to ask questions and participate in the discussion.

With the world looking for solutions to reduce global CO2 emissions, truck manufacturers are now beginning to introduce full-electric heavy vehicles to the market. While this is a welcome step in the right direction, the supply of these vehicles is ramping up too slowly to meet the necessary CO2 reduction requirements. At the same time, managers of fleets of heavy vehicles equipped with conventional diesel or CNG engines find themselves left with no solutions as governments tighten CO2 emission limits and mandate a rapid phasing out of fossil-fuelled vehicles.

Rather than feeling the pain of scrapping vehicles that are no longer compliant and writing off the asset value, fleet managers should consider converting their diesel/CNG vehicles to full-electric operation by installing a full-electric powertrain kit from Banke.

Place: Mellemvej, 20, Nordborg, 6430, DK.

Read more and register.
Zoom link for online participation.